§ 17.8.500. RESPONSIBILITY FOR COSTS IN CONNECTION WITH THE DEVELOPMENT OF SUBDIVISION PROJECTS  


Latest version.
  • The costs incurred in connection with the planning and development of a subdivision project shall be shared between the subdivide and the city in accordance with the following schedule:

    Plan or Facility Subdivider City
    1. Preparation of Vicinity Plan 100 percent 0 percent
    2. Preparation of Preliminary Plan and Improvement Drawings 100 percent 0 percent
    3. Easements and rights-of-way "on-site" and "off-site" 100 percent 0 percent
    4. Preparation of final plat and final engineering drawings and documents 100 percent 0 percent
    5. Grading and draining streets "on-site" 100 percent for all minor and collector streets Special negotiations with city council for all grading and drainage work over estimated costs of minor and collector streets
    6. Grading and draining streets "offsite" Special negotiations with the city council Special negotiations with the city council
    7. Bridges and culverts 100 percent for all minor and collector streets Special negotiations with city council for the costs of bridges and culverts in excess of the cost of such facilities required for minor and collector streets.
    8. Street paving 100 percent for all minor streets and for collector and arterial streets up to 44 feet of pavement width Special negotiations with city council for the cost of paving in excess of 44 feet of pavement width when such extra width is required by the city.
    9. Curb and gutter and curb cuts 100 percent 0 percent
    10. Sidewalk 100 percent 0 percent
    11. Street signs 100 percent 0 percent
    12. Water supply Convey water shares to city Purchase at going rate. Accept water shares.
    13. Water and sewer mains, "on-site" 100 percent for installing size of lines required to serve subdivision or standard-size lines, whichever is greater - Subject to repayment provisions as set forth under Section 4-5 For lines in excess of those required to be installed by subdivide - special negotiations with city council for difference between cost of installing size of lines required for the subdivision and those required by the city.
    14. Water and sewer mains, off-site 100 percent for installing size of lines required to serve subdivision or standard-size lines, whichever is greater - Subject to repayment provisions as set forth under Section 4-5. For lines in excess of those required to be installed by subdivide - special negotiations with city council for difference between cost of installing size of lines required for the subdivision and those required by the city.
    15. Street lighting 100 percent for easements and rights-of-way and installation of facilities 100 percent for maintenance of lights after installation
    16. Electric utilities 100 percent 0 percent
    17. Parks 0 percent 100 percent
    18. Monuments 100 percent 0 percent
    19. Canal and flood channel protection Special negotiations with city council Special negotiations with city council
    20. Elimination of other environmental hazards Special negotiations with city council Special negotiations with city council
    21. As-constructed drawings 100 percent 0 percent